I need a concrete slab 16'x6'x6".
Did I do the calculations properly when I came up with 5.33 yards of material?
Thanks.
Oooppss.. I found a formula on diynet.com that indicates it would be 1.777 yards.
I thought that 5+ sounded like way too much.
Double check me any way if you can.
Thanks a lot.
(I was calculating sq yards not cubic yards, duh!)
Warlock!
03-10-03, 11:22 AM
Yeah... 1.77 yds. If you're getting the concrete from a redi-mix concrete company (in other words, a concrete truck delivers it) you may want to see how much they charge for a "short load". Many companies charge as much as an extra $50/yd for deliveries under 2 yards. Therefore, instead of paying 1.3/4 yd x $70 per yd = $123.90, you pay 1.3/4 yd x ($70+$50) = $212.40. It may pay to bump up the yardage you order to just above the short-load limit (2 yd x $70 = $140).
Whatever you do, make sure you order enough... having to call back for an extra 1/2 yd is expensive!